Resources · Tools and guides

Know your numbers before you start.

The Cost Planner, the verified builder directory, and plain-English guides: everything to plan a project before you speak to anyone.

Cost Planner

UK-wide indicative costs. No commitment. Pick a project type, size and region for a realistic range.

Project

Approximate floor area

30 m²

Region

We match to the postcode area rather than the exact boundary. Your estimate is worked out in your browser. We keep a record of it, with no name or contact details, to improve the planner. If you have accepted analytics cookies, we link it to an enquiry you go on to send us.

Specification

Mid-range brands and finishes: what most projects use.

Specification sets the rate we price at. The range around it allows for what we cannot know yet, like site conditions and access.

Indicative budget range

£83,800 to £130,700

Typically around £102,148

Extension · 30 m² · UK average · Standard materials

Builder's work
£70,500
Design, structural and building control
£6,300
Planning application
£548
VAT at 20%
£15,500
Contingency (10%)
£9,300
Typical total
£102,148

If the property has stood empty for two years or more, or the work changes the number of dwellings, VAT may be 5% rather than 20%. We can't verify that, so we've assumed 20%.

Materials ~
£35,300
Labour ~
£35,200

A split of the builder's work line only.

Indicative only. Site conditions, access, materials and planning move the final figure. Builders price the project, not the range. This isn't a quote. Rates v5, reviewed August 2026. How we calculate this →

Get real quotes for this project

Rates, not guesses

Each trade carries essential, standard and premium rates, re-based against named public sources. We don't hold a BCIS licence and don't claim one.

Region and spec do different jobs

Spec picks which rate you're priced at. Region multiplies it: London (inner) ×1.30, UK average ×1.00, North East ×0.94. The range around the answer is a separate allowance for uncertainty.

VAT, fees and contingency are shown

Published UK build-cost rates exclude VAT. We add VAT, professional fees, the statutory planning fee and a contingency, each on its own line, so you can see what makes up the total.

Read the full methodology

Every rate, multiplier and source we use is published, along with when it was last reviewed.

How we calculate this

Found your range?

Get matched with verified builders. You choose who quotes, no cold calls, your contact details shared only with the tradesperson you appoint.

Start my project