How we calculate these numbers.

Every figure the Cost Planner shows is built from the tables on this page. They are published so you can check them, argue with them, or take them to a builder.

Rates version 5 · last reviewed 27 August 2026

What changed on 27 August 2026

We re-based every rate against the sources listed below, and we started showing VAT, professional fees, the statutory planning fee and a contingency as separate lines instead of leaving them out. Estimates went up noticeably — and most of that rise is those lines, not the rates. The published rates every UK cost guide quotes are the builder's work only, before VAT. A tool that showed you that number and called it your budget was understating what you actually need to find.

The calculation

  1. Take the trade's rate for the specification you picked, and multiply it by your size.
  2. Multiply by the regional multiplier for your area.
  3. Add professional fees — design, structural calculations and building control — which also scale by region.
  4. Add the statutory planning fee where planning applies. This is set by government, so it is the same everywhere and is not scaled.
  5. Add VAT at the applicable rate.
  6. Add contingency, as a percentage of everything above.
  7. That gives one figure. The published range is that figure multiplied by 0.82 and by 1.28.

The range is deliberately lopsided. Building work overruns far more often than it comes in under, so a symmetrical range would understate the risk that matters. Every figure is rounded to the nearest £100 inside the model and never re-rounded for display, which is why the lines on the result card add up exactly.

Specification

Specification chooses which rate you are priced at — not how wide the range is. The three tiers are three different rates per trade, and the range is a separate allowance for uncertainty around whichever one you picked.

Essential materials
Budget ranges, trade-standard fittings, keeping it simple. Priced at each trade's low rate below.
Standard materials
Mid-range brands and finishes — what most projects use. Priced at each trade's mid rate below.
Premium materials
High-end materials, bespoke joinery, designer fittings. Priced at each trade's high rate below.

Rates by trade

Per unit of size, excluding VAT — this is the builder's work only. Everything else is in the next table.

TradePerEssentialStandardPremium
Extension£1,850£2,350£3,050
Loft Conversion£1,300£1,850£2,500
Renovation£600£900£1,700
New Build£1,800£2,400£3,400
Garden / Landscaping£55£110£180
Kitchenroom£6,000£11,000£22,000
Bathroomroom£4,000£7,000£13,000
Plumbingwet room£1,250£1,700£2,400
Electrical£48£68£95
Roofing£85£120£200
Windows & Doorsopening£350£545£1,225
Plasteringroom£400£560£775
Painting & Decorating£40£50£80
Flooring£28£53£110
Driveways & Paving£55£105£170
Other£550£1,075£2,100

What gets added on top

TradeFees (standard)PlanningContingencyVAT
Extension£6,300£54810%20%
Loft Conversion£3,600£54810%20%
Renovation£2,600£010%20%
New Build£13,300£54810%0%
Garden / Landscaping£650£05%20%
Kitchen£400£05%20%
Bathroom£350£05%20%
Plumbing£1,400£05%20%
Electrical£280£05%20%
Roofing£280£05%20%
Windows & Doors£600£00%20%
Plastering£300£00%20%
Painting & Decorating£0£00%20%
Flooring£0£00%20%
Driveways & Paving£0£00%20%
Other£2,500£05%20%

Regions

The multiplier applies to the rate and to professional fees. It is a best fit by postcode area, not a boundary-accurate lookup — a few areas straddle a border and are assigned to where most of their population lives. If we have guessed wrong for you, pick the region by hand. An unrecognised postcode falls back to the UK average rather than to a guess.

RegionMultiplierPostcode areas
UK average×1.00Used when no postcode is given, or none matches
London (inner)×1.30EC, WC, W, SW, NW, N, E, SE
London (outer)×1.22BR, CR, DA, EN, HA, IG, KT, RM, SM, TW, UB, WD
South East×1.12BN, CT, GU, HP, ME, MK, OX, PO, RG, RH, SL, SO, TN
East of England×1.05AL, CB, CM, CO, IP, LU, NR, PE, SG, SS
South West×1.00BA, BS, DT, EX, GL, PL, SN, SP, TA, TQ, TR
West Midlands×1.00B, CV, DY, HR, ST, TF, WR, WS, WV
East Midlands×1.00DE, LE, LN, NG, NN
Yorkshire & the Humber×0.93BD, DN, HD, HG, HU, HX, LS, S, WF, YO
North West×0.95BB, BL, CH, CW, FY, L, LA, M, OL, PR, SK, WA, WN
North East×0.94CA, DH, DL, NE, SR, TS
Wales×0.94CF, LD, LL, NP, SA, SY
Scotland×1.00AB, DD, DG, EH, FK, G, HS, IV, KA, KW, KY, ML, PA, PH, TD, ZE
Northern Ireland×0.90BT

VAT

Most home improvement is standard-rated. A new dwelling built from scratch is zero-rated. A 5% rate can apply where a property has stood empty for two years or more, or where the work changes the number of dwellings — but those depend on facts about your property that we cannot check, so we assume the standard rate and tell you to ask. The trades where that is worth checking are Extension, Loft Conversion, Renovation, Plumbing.

Listed buildings do not get VAT relief. The zero rate for approved alterations to listed buildings was abolished on 1 October 2012. It is a common and expensive misunderstanding, so we would rather say it plainly than leave it out.

Contingency

Shown as its own line rather than hidden inside the rate, because it is money you hold back rather than money a builder quotes. Structural work carries 10%, fit-out work 5%, and supply-and-fit jobs where the scope is knowable up front carry none. Published UK guidance usually suggests 10–15%; we sit at the bottom of that because the range already carries a 28% high leg.

Sources

These are the sources we actually consulted when setting the rates. We do not hold a RICS or BCIS licence, and nothing here is BCIS-derived — you will see other sites claim that provenance, and we would rather tell you exactly what ours is.

How often this is reviewed

At least once a year, and sooner if construction costs move sharply. Our build fails automatically when the rates go past their review date, so a stale table cannot quietly stay live.