Skip to content

Roofing

Fixed once. Dry for decades.

Full re-roofs, flat-roof replacements, repairs and leadwork. Verified Premium roofers — one sealed-bid quote, no doorstep cold-callers.

Recent Roofing, Surrey

Full re-roofs typically £5k–£20k.
Verified

Recent Roofing, Essex

Full re-roofs typically £5k–£20k.

Recent Roofing, Birmingham

Full re-roofs typically £5k–£20k.

Anonymised recent matches.

01

What "Roofing" covers

Verified Premium specialists who handle the full scope, not just one slice. One auction, one builder, one point of contact.

Full re-roofs — tile, slate and fibre-cement

Flat-roof replacement (EPDM, GRP, felt)

Chimney repairs, leadwork and flashings

Fascias, soffits and guttering

02

What we typically include — and don't

A clear scope is the difference between a smooth project and the renovation horror story your friends tell at dinner.

Included

In scope
  • Scaffolding, strip-off and disposal
  • New membrane, battens and insulation where specified
  • Leadwork, flashings and guarantee paperwork

Typically not included

Priced separately
  • Loft conversion works (separate category)
  • Structural roof reconstruction beyond like-for-like
  • Solar panel installation (specialist installers)

03

Realistic cost range

Full re-roofs typically £5k–£20k.

The Project Cost Tool gives you a postcode-adjusted range with a clear breakdown of what’s included. Use it before you talk to a builder so you walk in knowing your numbers.

Open the cost tool

04

Common questions

Direct, plain answers. No marketing copy.

How much does a re-roof cost?

A straightforward tile re-roof on a three-bed semi typically £5k–£12k including scaffold; slate and complex roofs push towards £20k. Use the Project Cost Tool for a postcode-adjusted range.

How do I avoid rogue roofers?

Roofing attracts more doorstep cold-callers than any other trade. Every roofer on Compare Builders is verified — insurance, company history, reviews — before they can quote, and you get one sealed bid, not a knock at the door.

How long does a re-roof take?

A typical semi is 1–2 weeks on site including scaffold up and down. Weather can stretch that — good roofers strip only what they can felt and batten the same day.

Ready when you are

Compare verified
roofing builders now.

Two minutes through the funnel. One verified builder bids for exclusive access. No flood of cold calls.